Musco Lighting logo Project Showcase
Musco Lighting logo Project Showcase    Cricket
Company Overview
Permanent Lighting
Temporary Lighting
Project Showcase
News & Events
Televised Events
Contact Us
Request Information
Careers

Search musco.com
 
 
Lightline newsletter
Feedback
Replacement Parts & Service
Musco Finance
Control-Link Central™
Sussex County Cricket Club
Home of Sussex Sharks
Hove, England



Light Control
Level-8™ light control option reduces spill light and glare, minimizing light trespass on adjacent properties
Potentially wasted spill light is redirected onto the playing surface, providing uniform light, improved playability, enhanced spectator enjoyment and a more energy-efficient system

Custom Design
The use of multiple poles at each of the four locations, together with the ability to erect them close to the field of play, ensured that pole height was kept to a minimum, while still meeting the sports-lighting guidelines and approval of the local planners

Quality of Light
Achieves light levels to meet guidelines set forth for national play and television broadcast
Project Facts
216 SportsCluster-2® fixtures with Level-8™ light control option
(8) 33m Light-Structure Systems™
Performance
700 maintained lux (65 footcandles), horizontal over entire pitch
800 maintained lux (74.3 footcandles), vertical to main TV camera on the square
Printer-friendly format

Letter-size (935Kb PDF)

International A4-size (908Kb PDF)



Download the free
Adobe Acrobat Reader software:


Refer this project to a friend





800/825-6030
(1) 641/673-0411

Musco Home Page
Company Overview | Permanent Lighting | Temporary Lighting
Project Showcase | News & Events | Televised Events | Contact Us
Request Information | Careers | Privacy Policy | Terms Of Use
Site Map


© 1997 - 2010 Musco Sports Lighting. All rights reserved.